Tuesday, February 1, 2011

Meeting Notes 2/1/11


  • Have individual meetings for tasks getting done
  • Who is responsible for what:
    • Kirtan
      • Gas Sensors = kirtan
        • op amps, low pass filters, etc...
        • circuit design
        • pcb layout
      • Motors
        • motor controller
        • pcb layout
    • Charis
      • Mechanical
      • GPS
        • figure out exact power
        • unit: let them know what it interfaces with--- serial, spi, rs-232, ttl-serial
        • figure out the model
        • MAX232: TI has them
    • John
      • PCB design
      • Camera control
      • embedded wireless communications (ethernet controller)
      • Power
    • Hieu
      • LabVIEW
        • video
        • controller via usb
        • networking between robot and GUI
    • Lehar
      • LabVIEW
        • video
        • controller via usb
        • networking between robot and GUI
        • Create communication standard (excel spread sheet)
  • TO DO:
  • Charis - send lehar and hieu the communication standard paper in labVIEW
  • John- BOM link on front page
  • Everything ordered by next thursday (2/11/11)
    • finalize parts for power, units, and etc
    • design your circuit
    • prototype for the prototype
    • parts need to be here by 2/17-18/11
  • While things are coming in make sure to program chips/begin
  • Lehar- contact the physics and chemistry department + EUREKA
    • radiation
    • chemical 
  • Organization: 
    • g-groups = easy email
    • wiki = use to store research and final design
    • google docs = multiple editing
    • dropbox = final editions (personal documents other might want access to)
  • LabVIEW meeting tomorrow
    • 6-9
    • make sure to RSVP (E-mail John sent)

No comments:

Post a Comment